Rollback Drill Log
发布时间 2024-08-16 05:50:00 # 运维保障

One of the most overlooked parts of a release workflow is the rollback drill. Teams usually focus on how to ship forward, but real pressure starts when you need to step back within minutes.

Drill Goals

  • Finish the rollback within 10 minutes
  • Keep database schema compatibility intact
  • Verify that static asset cache does not mix old pages with new APIs

Steps in This Drill

  1. Send 10% of traffic through the canary path
  2. Watch error rate and key page metrics
  3. Trigger a controlled failure condition
  4. Execute the rollback script
  5. Verify monitoring, logs, and page cache

Result

  • Rollback duration: 7m 40s
  • Database: no rollback required
  • Cache: recovered after clearing two critical entry points manually
1
deployctl rollback --env production --version previous

Conclusion

The value of a drill is not the command itself. It is whether the team knows who sends the command, who validates recovery, and who communicates outward. A rollback plan is not finished just because it exists in a document. It needs at least one real run.